busy bee

mathew took the week off from work to concentrate on the house. the house has three levels, so depending on the noise level of his activity, i usually don’t find mathew on my first try. but i always bring the camera with me to capture the moment.

tile

cleaning out extra thin-set (mortar) between the tiles upstairs.

pipe

in the garage, bending pipe to cover electrical wires (using a pipe bending tool uncle ken loaned him.)

compostwoodworking

(left) out in the backyard filling our new composter. (right) in the garage, making a vanity (for the upstairs bathroom) using a cabinet making tool that was a gift many years ago from his brother.

the things i missed: mathew injuring himself (and getting blood on his overalls) while doing some plumbing in the bathroom. mathew painting the bedroom with a final coat of paint. i wanted him to do a “dramatic re-enactment” photo but he just wouldn’t play along.