movin’ slowly

not much happening here. i pottered around upstairs this weekend, looked at things, stripped some paint off the wainscote boards, and got back into bed:

wainscote paint stripping neededbathroom door casing

it may not look like much, but all that paint, glue and spackle takes about 10 min per foot to remove from each piece. and when your nose is running, it’s difficult (and messy) wearing a respirator.

i also got the head and side casing cleaned up, and attached at the bathroom door (above right). the side casing is the same wood shown in the first photo of last week’s post, after stripping about 1/8″ of paint. it is beautiful tight grained smooth old wood (where it doesn’t have nail holes and dents).

i also finally finished painting the (hopefully repaired) leaky mouldy window, patched a couple of roof leaks from the last storm, cleaned out some gutters. sorry, no photos yet – maybe next post.