I remember well the day we tore apart the old landing – ripping up work I’ve already done and finished feels so futile. Well, we finally got the tile back on.
First I had to get the landing waterproofed. I used Kerdi membrane – same as for showers. The part that’s a bit difficult to deal with is the transition at the edge.


Mole got back into her tile-cutting and helped to cut the tile while I was laying it out.



As the sun set, all tile was in place. Actually, this took a couple of days…

The whole deck is sloped towards the stairs, to try to get it to drain properly. Laying the tile in the warped areas is quite difficult.

Cutting pieces to fit edges and corners is where all the time comes.

Sorry, no visitors. Still needs grout.



OK, I think Arwen’s inspection was approved. Landing tiled!