productive saturday

tile cuttingsunset

mathew spent the first part of the day doing woodworking and paint prep in the bedroom. as the sun started setting we got to work on more tile.

shelvesjaneen

mathew cut solid slabs of travertine into shower shelves and figured out how to round and polish the cut edges. he did all of the cutting and i laid most of the tile.

janeentile

we worked on the bathroom for 6 hours saturday night (!) but in the end it was really satisfying to be almost done with the tile and shower.