We continued working on the Laundry room. I took off all the old siding, and added plywood. I ran out of coil strap (steel straps for shear walls can be bought individually, or in rolls, colloquially referred to as “coil strap.”) So there’s only strap below the window. Need to add some above it.
Once I got it all on, nailed, and cleaned up, we had a kitten inspection. They love this room.
Then I started on the second part: Raising the roof. Because of how this room has been built over the last hundred years (in bits and pieces tacked onto the previous pieces), the roof framing was haphazard. So I added new roof joists. I had to hold the roof up with 2×4’s while I cut the old framing and added in new.
It’s rather tricky figuring out how long to cut them, and what angle all the cuts need to be. When I put them in, because the roof slope was still steeper, they all looked short (above left). Then I put a beam across all of them, and started jacking. Above right you can see a gap forming between the wall and the roof!
Here’s me jacking up the ceiling. Maybe I should have been wearing my hard hat. Above right: When mole saw this gap, she said “this is not what normal people do to their house.” Poor house.
So Mole started working on taking out the old tile and plaster board where the old ‘shower’/toilet was. At first it was really tough going, but then she managed to get most of the wall off in one piece.
We then framed in a new wall to support the lifted up roof. Above right, you can see the gap where the roof has been raised up, and the new wall next to it. This wall is going to be mostly windows. Above left, Mole is looking out of one of the future window openings. I’ve used all the old scraps of plywood I can find to fill them in until the new windows are delivered in about four weeks! In the mean time, it’s looking like there was a fire. 🙁
Here’s Arwen playing in the comforter.