I think I’ve pointed this out before: Part of what takes me so long is I have to do much of the work more than once. When laying out the stairs, I was aware that it’s very important to keep the dimensions of each step identical. I waited to build the stairs until I’d bought the tile for the landing. I measured it, and included an estimate of the thickness of everything that goes under the tile. The building code requires the variation be less than 3/8″.

After building the stairs, putting on the Kerdi (same as in our shower) waterproofing membrane and starting to lay out the tile, I realized there was a problem.

(Above right) I was doing a last minute check that the stair heights were consistent. OOOoops. As you see, the top step is almost an inch higher with the tile installed. I’d not realized that the tile I bought has varying thicknesses. The pieces that are at the nosing are twice as thick as the tile I’d measured. Also, the combined thickness of the thinset under the cement board, under the Kerdi, and the membrane added up to almost 3/8″. Lesson: Assemble a mock up of the entire assembly including any waterproofing membranes and the actual tiles that will be used if the thickness of tile is important.

I had to tear out the landing and lower it. Fortunately I had John to help (above right).

After a full weekend detour, I was back to the start. Above right shows the waterproof membrane attached to metal flashing that goes over two layers of building paper under the cement board.

Using John’s tile saw, mole cut out the tile for the landing. Here it is all laid up, before sticking it down with thinset.

Thinset time! The little diamond shapes are hand made tiles from Mexico that a friend gave to me three years ago.

What? Think I can resist putting destructamonkey photos on the blog? Bella figured out how to jump from the bathroom counter onto an open door. Arwen can destroy a toilet roll in under 15 seconds.

Above left, Janeen’s family came to visit to celebrate birthdays. Above right, Misha came to stay for a week; so I put him to work…

Grouting and painting the front steps.

After much indecision on my part, we decided to paint the fronts of the steps (risers) to match the main house color, and we’ll paint the tops (treads) in a brownish caramel. I didn’t have any porch paint in that color, so to fortify the steps before the oncoming rain, we put a coat of the blue on them.

Before Misha’s visit was over, Reirin, Leo, Dan and Dad showed up. Dan is allergic to cats – he looks a bit pensive being the subject of Janeen’s test of our cats’ hypoallergenic qualities.

On the last morning of Misha’s visit, we met up with my “older brother”/friend/mentor Bob for breakfast at San Francisco’s best – and snobbiest – coffee place: Blue Bottle. Misha ran there in his North Brooklyn Runners shirt.