i’ve really been dragging my feet with making these posts…
(left) last friday mathew planed the door so it would fit into the door frame, as the bears watched.
(left) the closets are now completed with drywall. (right) and the anaglypta gets some paint.
(left) a hole that shows the right side of the door that leads into the bathroom from the bedroom. the original owners had closed this door but left the door and frame on the bedroom side. (right) toilet removed.
(left) and next goes the sink and vanity. and the cabinets and mirrors.
(left) all four closets now have drywall and taping done. we worked together in cutting and installing the drywall as well as taping with topping plaster. (right) morning sunlight streaming into the upstairs bedroom.
hope everyone had a good week!