Restoring a door

A few months ago (in my last post) — well, that was six months! — I started restoring the door that I was planning to put into the laundry room. Hmm, so riding my bike got in the way, and I stopped working on the house for quite some time! Very enjoyable.

Back to work:

01_LaundryDoor_2014092802_LaundryDoor_20140928

Above left I’m clamping pieces of redwood (the door is old growth redwood) to the sides of the door to slightly increase the width and height. Above right, I’m test-fitting in the pocket door opening.

03_Mortice_2014092804_lock_20140928

I also bought an old, beautiful brass door lock from building resources. The old door hardware is more difficult to install than the new hardware. I had to hand carve out a mortice to fit the lock.

05-ArwenFireworks_2014092806-BelleFireworks_20140928

And then July Fourth came along… Harrison street was again a war zone of fireworks: Exciting for humans, but terrifying for Arwen and Bella. We put their “thunder shirts” on. They look a bit peeved, but it did help to calm them down a bit.

07-notRelaxed_20140928

Not that they were totally calm… but at least they weren’t hiding under the couch!

08-DoorReady_2014092809-DoorStained_20140928

Here’s the door ready to be stained (left) and stained (right). Still need to put polyurethane on it.

10-SinkCabinet_2014092811-sinkCabinetStained_20140928

Right next to the door, in the laundry room, is a sink. I made a cabinet that will hold the sink, and be wall-hung. None of the walls are perpendicular, so it took some trial and error to get the cabinet the right shape. I stained it with the same stain used on the door. It came out close (a bit lighter) because it’s fir, not redwood.

12-DoorOn_20140928

Janeen spent a day filling all the nail holes, sanding and priming the wainscot. I finally finished installing all the trim.

13-allDone_2014092814-allDone_20140928

And here’s the door on, and the sink in. The room just needs tile on the floor and paint.